The invention discloses a thermal power plant boiler slag cooler with enhanced cooling waste heat utilization system and method, the system includes a heat exchanger, cooling coil and heat exchange tube group, with inlet and outlet of the heat exchanger, the water inlet pipe and steam condensate line heat exchanger is connected to the outlet pipe and deaerator heat exchanger the device is connected to the deaerator through the heat exchanger after the water in the cooling coil, two sets, two sets of cooling coils are respectively arranged on the two boiler slag cooler in the cooling chamber and is located in the two slag cooler were two, heat exchange tube group of water inlet and the water inlet pipe connected to the heat exchanger outlet for hot water pipe and water outlet pipe group heat exchanger is connected to the middle line of two sets of cooling coils respectively with the heat exchange tube groups are connected, the cooling coil is used for absorbing heat slag extractor, At the same time, the absorbed heat is sent into the heat exchanger. The invention also discloses a method for strengthening cooling and waste heat utilization of a boiler slag cooler in a heat and power plant.
【技术实现步骤摘要】
本专利技术涉及热电厂锅炉设备的冷却与余热利用系统及方法,具体是指。
技术介绍
目前,国内CFB (循环流化床)锅炉选用的纯风冷或风水联合冷却选择性冷渣器,主要用于解决冷渣器排渣温度高,导致排渣热损失大,影响锅炉效率问题。在以纯凝为主或外供热少的CFB锅炉热电厂,CFB锅炉冷渣器由于燃烧煤种出现较大变化时,容易出现温度超温现象,温度超温对下游排渣设备具有不良影响,影响下游排渣设备的使用寿命。现有技术中热电厂的部分设备图如图1所示,包括汽轮机冷凝水换热设备和两台锅炉冷渣器8,汽轮机冷凝水换热设备包括冷凝水管路1、换热器2、凝汽器3和除氧器4,换热器2具有进水管21和出水管22,换热器2的进水管21与汽轮机的冷凝水管路I相连接,通过冷凝水管路I接收来自汽轮机的冷凝水,换热器2的出水管22与除氧器4相连接,通过换热器2换热后的水进入除氧器4中,同时,在冷凝水管路I上旁支一条管路至凝汽器3中,两台锅炉冷渣器8分别具有选择室、冷却一室、冷却二室81和冷却三室。上述的解决方案选择上主要存有以下问题:(I)纯风冷选择性冷渣器,当燃用高灰份燃料或高负荷非设计燃料工况,容易出现排渣温度严重超温损坏设备问题。(2)在冷渣器的冷却一、二、三室都布置水冷盘管的风水联合选择性冷渣器,主要是一室正常运行时温度超过450°C,容易引起水冷盘管过热爆管,故障率高;另外,在冷却一、二、三室同时布置将大大缩减冷渣器流通面积并容易引起冷却器局部堵渣问题,国内同类装置已多次出现该问题,处理难度及安全风险大;多室增设水冷盘管冷源国内多选用外补脱盐水进行换热,方式单一,主要在化工厂外供蒸汽量 ...
【技术保护点】
热电厂锅炉冷渣器强化冷却与余热利用系统,其特征在于:该系统包括换热器(2)、冷却盘管(9)以及换热水管管组,所述换热器(2)具有进水管(21)和出水管(22),换热器(2)的进水管(21)与汽轮机的冷凝水管路(1)相连接,通过冷凝水管路(1)接收来自汽轮机的冷凝水,换热器(2)的出水管(22)与除氧器(4)相连接,通过换热器(2)换热后的水进入除氧器(4)中,所述的冷却盘管(9)为两套,两套冷却盘管(9)分别安装在锅炉的两个冷渣器(8)中,并且分别位于两个冷渣器(8)的冷却二室(81)内,所述换热水管管组的进水端与所述换热器(2)的进水管(21)相连接,换热水管管组的出水端与所述换热器(2)的出水管(22)相连接,所述的两套冷却盘管(9)分别与所述换热水管管组的中间管路相连接,冷却盘管(9)用于吸收排渣器底渣的热量,降低冷渣器(8)的排渣温度,控制排渣温度在正常温度范围内,同时将吸收的热量送入换热器(2)中,实现冷渣器底渣热量的余热回收再利用。
【技术特征摘要】
1.热电厂锅炉冷渣器强化冷却与余热利用系统,其特征在于:该系统包括换热器(2)、冷却盘管(9)以及换热水管管组,所述换热器(2)具有进水管(21)和出水管(22),换热器(2)的进水管(21)与汽轮机的冷凝水管路(I)相连接,通过冷凝水管路(I)接收来自汽轮机的冷凝水,换热器(2)的出水管(22)与除氧器(4)相连接,通过换热器(2)换热后的水进入除氧器(4)中,所述的冷却盘管(9)为两套,两套冷却盘管(9)分别安装在锅炉的两个冷渣器(8)中,并且分别位于两个冷渣器(8)的冷却二室(81)内,所述换热水管管组的进水端与所述换热器(2)的进水管(21)相连接,换热水管管组的出水端与所述换热器(2)的出水管(22)相连接,所述的两套冷却盘管(9)分别与所述换热水管管组的中间管路相连接,冷却盘管(9)用于吸收排渣器底渣的热量,降低冷渣器(8)的排渣温度,控制排渣温度在正常温度范围内,同时将吸收的热量送入换热器(2)中,实现冷渣器底渣热量的余热回收再利用。2.根据权利要求1所述的热电厂锅炉冷渣器强化冷却与余热利用系统,其特征在于:所述的换热水管管组包括母管(5)、进水总管(6)、第一分支管(61)、第二分支管(62)和回水总管(7),所述母管(5)的进水端即为所述换热水管管组的进水端,母管(5)的进水端与所述换热器(2)的进水管(21)相连接,所述换热器(2)的进水管(21)在与母管(5)的进水端相连接的连接点的前、后附近处均安装有阀,母管(5)的进水端在靠近端...
【专利技术属性】
技术研发人员:蔡维中,郑文凯,崔小武,卢晓斌,凌奕任,蔡兴俊,韩风,柯芳标,
申请(专利权)人:中国石油化工集团公司,
类型:发明
国别省市:
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。