A construction equipment monitoring system (BAS) debugging method of the project, mainly to solve the construction equipment monitoring system (BAS) software and hardware engineering debugging work often depends on the issue of construction progress of other units. The main technical measures are: 1. in the own work site will all the system components, CPU controller, and all kinds of module base, all kinds of equipment and components, according to the network structure, system diagram and wiring diagram of the whole system, correct connection and assembly of complete sets of centralized and orderly place. 2. in the own work site will have good control applications downloaded to the appropriate CPU controller, simulation debugging of system hardware and software. 3. in the own job site should complete the rest in debugging computer and central management station (station) on the completion of the work; and then in the central management station (station) for the whole system simulation debugging, system function test and simulation test.
【技术实现步骤摘要】
本专利技术涉及一种建设工程的子分部工程即建筑设备监控系统(BAS)工程中软件、硬件的 调试方法。
技术介绍
目前,在对建筑设备监控系统(BAS)工程中的软件、硬件进行调试时,都要在DDC控制 箱体及组装成套完毕的底板、网关设备、交换机、中央管理工作站(操作站)以及系统中其 他应有的元器件等全部都安装到了施工现场,且现场有电源以及受控的机电设备手动运行正 常后才能进行。这使得该专业的调试工作极大地受制于土建单位和机电安装单位的施工进度。 很大程度上地影响着该专业的竣工验收以及整个工程项目的竣工验收。
技术实现思路
为了使建筑设备监控系统(BAS)工程中软件、硬件的调试工作能不受制约且快速有效地进行,本专利技术提供一种调试方法,该方法不再需要先把系统中的部件、设备、元器件等安装到施工现场,也无须等到现场有电源和受控的机电设备手动运行正常,就能对整个系统中的软件、硬件进行模拟调试和模拟试运行;从而能提前解决处理完毕系统中软件、硬件所出现的问题;不再受其他单位施工进度的制约,独立自主地完成整个系统中软件、硬件绝大部分的调试工作。 技术方案第一步在己方的工作场地内将系统中所有的部件、CPU控制器、各类模块及底座、各类设备、元器件等,按照接线图、系统图和整个系统的网络结构图组装成套、正确连接且集中有序地摆放好;同时编制控制应用程序、制作楼层界面、被控设备界面等。第二步将已编制好的控制应用程序下载到相应的CPU控制器中,然后在己方的工作场地内集中有序地对控制应用程序、CPU控制器、各类模块进行模拟调试。以检测控制应用程序的 正确性完备性,检测CPU控制器、各类模块及底座、 ...
【技术保护点】
一种建筑设备监控系统(BAS)工程的调试方法。其主要特征是:在已方的工作场地内,将系统中所有的部件、CPU控制器、各类模块及底座、各类设备、中央管理工作站(操作站)、各类元器件等,按照接线图、系统图和整个系统的网络结构图组装成套、正 确连接且集中有序地摆放好,集中而有序地对整个系统中的软件、硬件进行模拟调试,对整个系统进行功能测试和模拟试运行。
【技术特征摘要】