The invention discloses a new submerged arc welding process for thick plate of wind power foundation, which comprises the following steps: blanking treatment, groove treatment before welding, assembly welding, temperature control, welding, appearance inspection and non-destructive inspection. The invention has the following advantages: adopting the method of \reserved point blanking\, which can better guarantee the blanking size; adopting solid gas shielded welding GMAW for assembly, selecting carbon dioxide gas shielded welding wire er50 \u2011 6 (passing the retest at \u2011 40 \u2103), which conforms to the performance of the base metal and can meet the requirements of the welding process; adopting f5a4 \u2011 H10Mn2 / sj101 welding wire flux combination, The production efficiency is high, and the weld quality requirements are also guaranteed; the heating tooling is designed according to the cylinder structure, and the straight circular steel tube is connected between the two arc-shaped circular steel tubes as the oxygen \u2011 propane gas channel, supported by a triangular bracket to ensure its stability. Before work, prepare the gas storage tank, ventilate and ignite, and then start work, so as to achieve uniform preheating and post weld heat preservation, and better protection Verify welding quality and improve efficiency.
【技术实现步骤摘要】
一种风电基础厚板埋弧焊接新工艺
本专利技术涉及焊接
,具体涉及一种风电基础厚板埋弧焊接新工艺。
技术介绍
随着风电基础技术的不断完善,大兆瓦系列的塔筒应运而生,不断的在实际中得到应用。例如华能大丰海装5MW和三峡大丰金风6.45MW都取得了较好的实用效果。大兆瓦系列风电基础相比于普通塔筒来说,最大的特点就是板厚较大,这样有利于塔架基础的稳定性能以及安全性能。并且焊缝质量等级须符合现行国家标准《承压设备无损检测》(NB/T47013-2015)规定,达到一级合格。但是较厚的钢板焊缝焊接具有如下特点和难点:1、施焊时较难保证焊缝的熔深、熔宽;2、由于厚板厚度较大,极易出现尺寸超差情况,需要严格控制下料变形、坡口尺寸;3、部件厚度大,在装配焊以及埋弧焊过程中,容易产生焊接变形和焊接裂纹。
技术实现思路
为解决上述较厚的钢板焊缝焊接存在的难点问题,本专利技术提供了一种风电基础厚板埋弧焊接新工艺。本专利技术采用的技术方案是:一种风电基础厚板埋弧焊接新工艺,包括以下步骤:a、下料处理:用磁吸铁吸住厚板放置在工作台上,调出厚板下料程序导进数控火焰切割机上,数控火焰切割机依据程序进行下料作业,筒体切割尺寸偏差径向长度方向误差要求0-2mm,板宽之差≤2mm,对角线之差≤3mm;b、焊前坡口处理:用磨光机打磨钢板边缘,使钝边与坡口较好成型,并清理坡口附近25mm范围内的杂质;c、装配焊:采用实心气保焊GMAW在厚板与厚板之间进行组装定位,每隔120mm确定一个装配焊点进 ...
【技术保护点】
1.一种风电基础厚板埋弧焊接新工艺,其特征在于,包括以下步骤:/na、下料处理:用磁吸铁吸住厚板放置在工作台上,调出厚板下料程序导进数控火焰切割机上,数控火焰切割机依据程序进行下料作业,筒体切割尺寸偏差径向长度方向误差要求0-2mm,板宽之差≤2mm,对角线之差≤3mm;/nb、焊前坡口处理:用磨光机打磨钢板边缘,使钝边与坡口较好成型,并清理坡口附近25mm范围内的杂质;/nc、装配焊:采用实心气保焊GMAW在厚板与厚板之间进行组装定位,每隔120mm确定一个装配焊点进行加固,每段装配焊60mm长,装配焊处根部0~1mm的间隙;/nd、温度控制:在坡口两侧120mm范围内用氧丙烷火焰均匀加热,加热完成后用温度仪对坡口温度进行测量,温度达标后才能进行焊接作业,将预热温度控制在110-160℃,层间温度控制在110-200℃;/ne、焊接:厚板和厚板进行焊接,先在筒体内部进行埋弧焊接,将内侧焊接完成,直至盖面,然后再在筒体外侧采用碳弧气刨清根后,用磨光机将清根后表面的渗碳层与溶渣进行打磨,直至露出金属光泽,而后再进行埋弧焊接,盖面焊接完成后,施焊结束,纵缝用石棉将焊缝覆盖,环缝焊接完成后, ...
【技术特征摘要】
1.一种风电基础厚板埋弧焊接新工艺,其特征在于,包括以下步骤:
a、下料处理:用磁吸铁吸住厚板放置在工作台上,调出厚板下料程序导进数控火焰切割机上,数控火焰切割机依据程序进行下料作业,筒体切割尺寸偏差径向长度方向误差要求0-2mm,板宽之差≤2mm,对角线之差≤3mm;
b、焊前坡口处理:用磨光机打磨钢板边缘,使钝边与坡口较好成型,并清理坡口附近25mm范围内的杂质;
c、装配焊:采用实心气保焊GMAW在厚板与厚板之间进行组装定位,每隔120mm确定一个装配焊点进行加固,每段装配焊60mm长,装配焊处根部0~1mm的间隙;
d、温度控制:在坡口两侧120mm范围内用氧丙烷火焰均匀加热,加热完成后用温度仪对坡口温度进行测量,温度达标后才能进行焊接作业,将预热温度控制在110-160℃,层间温度控制在110-200℃;
e、焊接:厚板和厚板进行焊接,先在筒体内部进行埋弧焊接,将内侧焊接完成,直至盖面,然后再在筒体外侧采用碳弧气刨清根后,用磨光机将清根后表面的渗碳层与溶渣进行打磨,直至露出金属光泽,而后再进行埋弧焊接,盖面焊接完成后,施焊结束,纵缝用石棉将焊缝覆盖,环缝焊接完成后,将加热工装放在固定支架上,开启滚轮架转两圈对环缝表面进行均匀加热,保温缓冷预防裂纹的产生;
f、外观检测:在质检进行VT之前,焊工需要先自检,保证焊缝外观情况完好,焊缝表面不得有夹渣、裂纹、咬边和气孔缺陷;
g、无损检测:VT合格后,48小时后做UT检测,丁字缝加测RT、MT。
2.根据权利要求1所述的一种风电基础厚板埋弧焊接新工艺,其特征在于,步骤c中的所述实心...
【专利技术属性】
技术研发人员:夏小勇,刘云飞,葛纯亮,
申请(专利权)人:江苏海力风电设备科技股份有限公司,
类型:发明
国别省市:江苏;32