The present invention is a deviation rectification method for continuous bridge jacking construction based on the jacking method in the field of road and bridge construction. It mainly includes the deviation monitoring part and the correction part. Its characteristics are that before the jacking construction, an infrared sensor receiver and a sliding Jack are set on each pier top, and an infrared transmitter is set at the corresponding position with the beam body of section 1. In the process of jacking construction, infrared calibration technology is used to monitor the beam and pier. In the correction part, the transverse displacement of the beam is adjusted by preset sliding jack on the top of the pier. The invention does not need to add complex bench structure, avoids the situation that the beam body is easily damaged when the beam body is adjusted by pushing thrust and guiding mechanism together, greatly reduces the labor force, can quickly and accurately detect the formation of errors in the first time and can be adjusted immediately, has simple structure design, is convenient to dismantle, is not affected by bridge structure, and is suitable for pushing most multi-span continuous bridges. The construction improves the efficiency of the whole construction and shortens the construction period.
【技术实现步骤摘要】
连续桥梁顶推施工纠偏方法
涉及一种关于桥梁施工顶推法的纠偏方法,属于桥梁建筑工程领域。技术背景在科技技术发展的步伐下,桥梁建筑工程中出现越来越多的造桥方法,其中顶推法便是一种质量易控制、占用场地少、不受季节限制的高效的桥梁上部结构施工方法,却又是施工难度较大、精度要求极高的施工方法。顶推法施工是在沿桥纵轴方向的台后设置预制场地,分节段预制梁,并用纵向预应力筋将预制节段与施工完成的梁体联成整体,然后通过水平千斤顶施力,将梁体向前顶推出预制场地,然后继续在预制场进行下一节段梁的预制,直至施工完成。其施工难度在于顶推法施工是需要经过精密计算,对各个部分进行划分,每个部分数据都有明确规定,不能多不能少,出现少少偏差就会影响整段桥梁偏移桥墩中心线,引起安全事故,故顶推法施工非常看重偏差处理。如何有效、精准、安全、便捷地纠正偏差成为现阶段相关技术人员需要研究的一大问题。
技术实现思路
本专利技术提供一种连续桥梁顶推施工的纠偏方法。相对于现有技术中来说,本专利技术的特点是采用电子技术取代传统机械结构或者测量仪器来检测桥梁顶推施工时的偏移位移量,并把数据反馈到施工人员的控制现场,经过相关计算分析后再通过在桥墩上预先设置的调整设备对桥梁进行调整,致力于在每一跨顶推完成后即可实时检测偏移位移量,把误差扼杀在初始阶段防止其扩大。具体施工步骤如下:a.根据桥梁建筑图纸建造好桥墩,并在墩台后桥头搭建制梁台。为保证后续在顶推过程中梁体总体稳定和设备抗倾覆安全,制梁台的位置尽量设置靠桥头,在平稳较开阔处,必要时在制梁台底下设计临时桩基础,防止土体沉降现象;制梁台后方50m处安全地带设置 ...
【技术保护点】
1.连续桥梁顶推施工纠偏方法,其特征在于,包括以下步骤:a.先根据桥梁建筑图纸建造好桥墩,在墩台后桥头搭建制梁台,制梁台后方50m处安全地带设置控制台;b.依照桥梁建筑图纸在计算机上建立预制箱梁梁体和桥墩模型,进行第一次顶推施工模拟对接,计算出各个桥墩顶与箱梁梁体对应支撑的理想位置,在桥墩顶边角处和梁体底部边角处分别选择出两个能同时垂直对应、又不会影响到其他结构施工的有效定点;c. 每个桥墩顶部上安装临时支座、滑道滑板,滑道滑板设置在临时支座上;临时支座侧边设置滑动千斤顶并固定好,并在上述桥墩顶部有效定点设置红外线感应接收器;d.制梁台前端安装导梁,浇筑1号节段梁体与之固定,顶推1号节段梁体上前,继续浇筑下一个节段梁体,待1号节段梁体强度达到要求后,拆模,养护,原地进行预应力张拉及首次压浆工序;所有工序完成后,在有效定点处黏合固定红外线发射器;e.完成1、2号节段梁体的施工后,进行第二次实体模拟顶推施工对接;通过顶推千斤顶顶推节段1、2和导梁前进一个节段的距离,观察梁体前进轨迹;此时导梁处于悬空状态,暂停顶推使其停留1min,计算导梁挠度和弯矩值,初步观察梁体是否发生较大的横向位移;然 ...
【技术特征摘要】
1.连续桥梁顶推施工纠偏方法,其特征在于,包括以下步骤:a.先根据桥梁建筑图纸建造好桥墩,在墩台后桥头搭建制梁台,制梁台后方50m处安全地带设置控制台;b.依照桥梁建筑图纸在计算机上建立预制箱梁梁体和桥墩模型,进行第一次顶推施工模拟对接,计算出各个桥墩顶与箱梁梁体对应支撑的理想位置,在桥墩顶边角处和梁体底部边角处分别选择出两个能同时垂直对应、又不会影响到其他结构施工的有效定点;c.每个桥墩顶部上安装临时支座、滑道滑板,滑道滑板设置在临时支座上;临时支座侧边设置滑动千斤顶并固定好,并在上述桥墩顶部有效定点设置红外线感应接收器;d.制梁台前端安装导梁,浇筑1号节段梁体与之固定,顶推1号节段梁体上前,继续浇筑下一个节段梁体,待1号节段梁体强度达到要求后,拆模,养护,原地进行预应力张拉及首次压浆工序;所有工序完成后,在有效定点处黏合固定红外线发射器;e.完成1、2号节段梁体的施工后,进行第二次实体模拟顶推施工对接;通过顶推千斤顶顶推节段1、2和导梁前进一个节段的距离,观察梁体前进轨迹;此时导梁处于悬空状态,暂停顶推使其停留1min,计算导梁挠度和弯矩值,初步观察梁体是否发生较大的横向位移;然后用顶推千斤顶反向顶推把梁体推回原处,如此反复3次,通过初步观察和计算得出数据,以推断导梁与1号节段梁体是否整体连接稳定,与其钢筋锚固性是否可靠,滑道是否平稳对齐;经测验后若有问题,则需重新安装固定导梁和滑道,若无问题则可以进行正式顶推施工;f.相关准备工作完成后,开始对梁体进行顶推施工,使用顶推千斤顶对梁体进行顶推,边顶推边进行后续梁体预制;若红外线感应接收器监测出梁体发生偏移,则停止顶推施工,相关人员到指定位置测量出梁体偏移的横向位移,再可根据导梁挠度相关理论数据计算得出纠偏理论轨迹,便可启动桥墩上滑动千斤顶进行横向位移调整;g.顶推施工结束,拆除所有红外线设备;1号节段梁底面的两个小开孔需喷水清洗,之后填充水...
【专利技术属性】
技术研发人员:梁春,罗大庆,刘承志,
申请(专利权)人:广西南宁胜祺安科技开发有限公司,
类型:发明
国别省市:广西,45