The utility model discloses a sewage filtering device for heating engineering, which comprises a heat insulation buffer bin; the inner lower part of the heat insulation buffer bin is separated into a sewage bin and a water purification bin through a heat conducting plate; the sewage bin is provided with a thick filter cover plate on the top of the heat conducting plate; and the middle filter is fixed near the side of the heat conducting plate above the thick filter cover plate. The other side of the intermediate filter plate is fixed with one side of the top of the heat insulation buffer bin; the bottom of the intermediate filter plate is fixed with a fine filter plate far from the thick filter cover plate; the intermediate filter plate and the fine filter plate are V-shaped structure; the other side of the fine filter plate is fixed with the inner wall of the heat insulation buffer bin; and the top of the water purification bin is installed with a fine filter plate. Coarse activated carbon filter; The sewage filter device of the heating engineering of the utility model can carry out heat exchange recovery. When filtering, it passes through three filters from coarse to fine and two filters from coarse to fine. Finally, through photocatalytic purification, the power effect is good and the purification efficiency is high.
【技术实现步骤摘要】
一种供热工程污水过滤装置
本技术涉及一种供热工程净水组件,具体涉及一种供热工程污水过滤装置,属于供热工程净水组件
技术介绍
自然界的能源直接或间接地转化为热能,以满足人们需要的科学技术,称为热能工程;生产、输配和应用中、低品位热能的工程技术,称为供热工程;供暖就是用人工方法向室内供给热量,保持一定的室内温度,以创造适宜的生活条件或工作条件的技术;所有供暖系统都由热源、供热管网和散热设备三个主要部分组成;由于长期运行,容易使供热管网产生水垢,造成供热效率降低,现有技术中,一般对进水端会增加一污水过滤器,现有的污水过滤器很难一次性将污水过滤彻底,同时造成污水内的热量浪费严重。
技术实现思路
为解决上述问题,本技术提出了一种供热工程污水过滤装置,能够进行热量换热回收,过滤时,通过三道由粗至细的滤板,两道由粗至细的活性炭滤网;最后通过光催化净化,功率效果好,净化效率高。本技术的供热工程污水过滤装置,包括隔热缓冲仓;所述隔热缓冲仓内侧下部通过导热板分隔为污水仓和净水仓;所述污水仓于导热板顶部设置有粗过滤罩板;所述粗过滤罩板上方靠近导热板一侧固定有中间过滤板;所述中间过滤板另一侧与隔热缓冲仓顶部一边侧固定;所述中间过滤板底部远离粗过滤罩板一侧固定有细过滤板;所述中间过滤板和细过滤板呈V型结构;所述细过滤板另一侧与隔热缓冲仓内壁固定;所述净水仓顶部安装有粗活性炭滤网;所述净水仓于粗活性炭滤网下方设置有细活性炭滤网;所述净水仓底部一体延伸有光催化净化仓;所述光催化净化仓上设置有净水出管;所述光催化净化仓内侧安装有光催化净化滤网;所述污水仓下部通过进水泵连接到进水管。 ...
【技术保护点】
1.一种供热工程污水过滤装置,其特征在于:包括隔热缓冲仓(1);所述隔热缓冲仓(1)内侧下部通过导热板(2)分隔为污水仓(3)和净水仓(4);所述污水仓(3)于导热板(2)顶部设置有粗过滤罩板(5);所述粗过滤罩板(5)上方靠近导热板一侧固定有中间过滤板(6);所述中间过滤板(6)另一侧与隔热缓冲仓(1)顶部一边侧固定;所述中间过滤板(6)底部远离粗过滤罩板(5)一侧固定有细过滤板(7);所述中间过滤板(6)和细过滤板(7)呈V型结构;所述细过滤板(7)另一侧与隔热缓冲仓(1)内壁固定;所述净水仓(4)顶部安装有粗活性炭滤网(8);所述净水仓(4)于粗活性炭滤网下方设置有细活性炭滤网(9);所述净水仓(4)底部一体延伸有光催化净化仓(10);所述光催化净化仓(10)上设置有净水出管(11);所述光催化净化仓(10)内侧安装有光催化净化滤网(12);所述污水仓(3)下部通过进水泵(13)连接到进水管(14)。
【技术特征摘要】
1.一种供热工程污水过滤装置,其特征在于:包括隔热缓冲仓(1);所述隔热缓冲仓(1)内侧下部通过导热板(2)分隔为污水仓(3)和净水仓(4);所述污水仓(3)于导热板(2)顶部设置有粗过滤罩板(5);所述粗过滤罩板(5)上方靠近导热板一侧固定有中间过滤板(6);所述中间过滤板(6)另一侧与隔热缓冲仓(1)顶部一边侧固定;所述中间过滤板(6)底部远离粗过滤罩板(5)一侧固定有细过滤板(7);所述中间过滤板(6)和细过滤板(7)呈V型结构;所述细过滤板(7)另一侧与隔热缓冲仓(1)内壁固定;所述净水仓(4)顶部安装有粗活性炭滤网(8);所述净水仓(4)于粗活性炭滤网下方设置有细活性炭滤网(9);所述净水仓(4)底部一体延伸有光催化净化...