The utility model discloses a pile foundation hole position center locator, which includes a positioning ring, a splint A, a connecting plate, a splint B, a positioning plate, a steel drill and a lift board. The splint and splint A are located at the edge position of the positioning ring. The splint A is fixed to the connecting plate, and the connecting plate is fixed to the positioning board through the splint B, and the positioning is located. The lower part of the plate is provided with a steel drill. By adopting the utility model, the center position of the pile foundation can be more precise and accurate, the workload can be reduced, and the construction process is more stable and cost saving.
【技术实现步骤摘要】
一种桩基孔位中心定位器
本技术涉及一种桩基孔位中心定位器,尤其涉及一种桩基孔位中心定位器。
技术介绍
工程施工中,桩基础是下部结构的重要组成部分,桩基施工过程中,由于测量交接及现有施工工艺施工过程误差,导致桩基偏位情况普遍存在。按照现有施工工艺,在桩基施工过程中,桩基孔位中心复核时工作量大。目前桩基施工工艺流程:场地平整→测量放样(测量人员与施工人员进行交接)→拉设十字护桩埋设护筒→钻孔及成孔、清孔→下钢筋笼→二次清孔及混凝土灌注。期间存在问题如下:1、测量放样后,测量人员对施工人员进行桩位技术交底,施工人员对点位进行确认及保护,因桩位放样与护筒埋置一般不是立即进行,期间存在桩位保护不利的情况发生,解决此问题一般是在护筒埋置完成后再次进行测量复核,再次复核致使测量工作量增大。2、拉设十字护桩后埋置护筒,为确保钻孔过程中护筒不下沉,设计要求护筒直径比桩基设计桩径至少大20cm,护筒埋置完成后,测量人员或技术人员需对护筒顶面高程进行测量并下达高程技术交底,但桩基施工过程中护筒存在下沉及偏位等情况,一般在钢筋笼下放时,需要重新测量高程,确保钢筋笼安装于设计位置,故桩基施工过程中,至少需要进行两次高程测量。3、钻孔过程中,因施工人员工作误差,不能保证每次进尺均位于一定精度范围内,实际桩基中心位置与设计位置偏差较大,会产生桩基多次倾斜,导致孔径增大等问题。4、为确保钢筋笼安装于设计高程,钢筋笼下放前需对孔位中心及护筒高程进行复核,工作量较大。5、因钻孔过程中孔径过大,桩基灌注时所需额外混凝土数量增多,增加施工成本。
技术实现思路
本技术目的在于提供一种桩基孔位中心定位器,以 ...
【技术保护点】
1.一种桩基孔位中心定位器,其特征在于,包括定位环(1)、夹板A(2)、连接板(3)、夹板B(4)、定位板(5)、钢钎(6)和搭板(7),所述搭板(7)、夹板A(2)设于定位环(1)边缘位置,所述夹板A(2)与连接板(3)固定连接,所述连接板(3)通过夹板B(4)与定位板(5)固定连接,所述定位板(5)下部设有钢钎(6)。
【技术特征摘要】
1.一种桩基孔位中心定位器,其特征在于,包括定位环(1)、夹板A(2)、连接板(3)、夹板B(4)、定位板(5)、钢钎(6)和搭板(7),所述搭板(7)、夹板A(2)设于定位环(1)边缘位置,所述夹板A(2)与连接板(3)固定连接,所述连接板(3)通过夹板B(4)与定位板(5)固定连接,所述定位板(5)下部设有钢钎(6)。2.根据权利要求1所述的桩基孔位中心定位器,其特征在于,所述定位板(5)下部设...