The utility model discloses a foaming mold production line automatic die changing preparation station, including the changeover station of the main frame, safety, driving beam and open crane, crane beam which is installed on the die change station of the main bracket, driving beam is arranged on the opening of the crane; safety installed in die changing station the main stand, the safety and driving parallel beam. The utility model is provided with a driving beam and opening of crane, through opening crane can be completely open and close the mold, the utility model has the advantages of safety in the mold after open mold mold mold lock, prevent crane malfunction or rope fault hidden dangers for the operator; the utility model can shorten the lead time, improve the production efficiency, the utility model has the advantages of simple structure, low cost.
【技术实现步骤摘要】
一种发泡生产线自动模架换模准备站
本技术属于发泡设备
,尤其是涉及一种发泡生产线自动模架换模准备站。
技术介绍
随着各种类型的发泡生产线自动化程度的提高,以及产品种类的增加,高度自动化的生产线对于更换不同种类的产品模具的要求也不断地增加和提高。目前设计的自动生产线更换模具时需要停止生产,并在生产线上进行模具的更换,更换后的新模具还需要等待预热后才能转入正常的发泡生产,一般情况下,更换模具的时间为20-25分钟,等待模具预热的时间为30分钟,这个时间将大大影响生产线的产量。
技术实现思路
为了解决上述技术问题,本技术提供一种结构简单、能够缩短换模所需时间,提高生产效率的发泡生产线自动模架换模准备站。本技术采用的技术方案是:一种发泡生产线自动模架换模准备站,包括换模站主体支架、安全栓、行车梁及开模吊车,所述的行车梁安装在换模站主体支架上,行车梁上设有开模吊车;所述的安全栓安装在换模站主体支架上,安全栓与行车梁平行。上述的发泡生产线自动模架换模准备站中,所述的换模站主体支架为L形框架结构,换模站主体支架的底座上设有模架安装座。上述的发泡生产线自动模架换模准备站中,还包括门式支架,行车梁安装在换模站主体支架和门式支架上,行车梁位于模架安装座上方。与现有技术相比,本技术的有益效果是:本技术设有行车梁和开模吊车,通过开模吊车可以将模架完全打开和关闭,本技术的安全栓在模架打开后,锁住模架的上模,防止了开模吊车误动作或吊绳断裂对操作者带来安全隐患;本技术缩短了更换模具的时间,提高了生产效率,本技术结构简单,成本低。附图说明图1是本技术的立体图。图2是本技术在模架合模状态时的 ...
【技术保护点】
一种发泡生产线自动模架换模准备站,其特征是:包括换模站主体支架、安全栓、行车梁及开模吊车,所述的行车梁安装在换模站主体支架上,行车梁上设有开模吊车;所述的安全栓安装在换模站主体支架上,安全栓与行车梁平行。
【技术特征摘要】
1.一种发泡生产线自动模架换模准备站,其特征是:包括换模站主体支架、安全栓、行车梁及开模吊车,所述的行车梁安装在换模站主体支架上,行车梁上设有开模吊车;所述的安全栓安装在换模站主体支架上,安全栓与行车梁平行。2.根据权利要求1所述的发泡生产线自动...
【专利技术属性】
技术研发人员:赵正林,陈科军,田红武,刘缔,张思遥,梁有志,李茂青,周鄂军,王建红,
申请(专利权)人:湖南精正设备制造有限公司,
类型:新型
国别省市:湖南,43
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。