The invention discloses a method for processing of high-rise building foundation pile construction method, which is characterized in that: (1) the pin fixed inside and outside tube sinking pile depth, pile core tip out of external tube, the pile tip penetration depth design requirements; (2), will bring the core tube, outward immersed concrete filled. Not from the external tube in concrete, the vibration hammer driven along the outer core pipe ramming reamed in concrete, to meet the design requirements of belled pile construction; (3), gray concrete high-rise building construction design requirements of the construction of. (4) the steel cage is welded on the ground, and the hole is loaded and adjusted and fixed. (5) pull out the core pipe, put the steel cage along the external immersed tube, put into practice, and implement the pile operation.
【技术实现步骤摘要】
一种高层建筑地基处理成桩施工方法
本专利技术涉及的是建筑地基基础处理
,具体为一种高层建筑地基处理成桩施工方法。
技术介绍
随着建筑施工技术的提高,高层建筑在很多大城市不断出现,高层建筑基础施工及地基处理技术接近国际先进水平,桩基是当前应用最为广泛的一种基础形式,混凝土预制桩由于振动噪声污染,挤土效应等缺陷,使用量相对减少。发展最快,适用最广泛是灌注桩,因为它可适用于任何地层土质,可形成任一桩径、桩长,满足不同承载力要求。我国高层建筑广泛采用灌注桩,积累了不少没计和施工的经验,灌注桩基施工工艺技术也有长足的发展。灌注桩在工作条件下的强度计算,原则上和钢筋混凝土预制桩相同。目前现浇灌注桩桩径越来越大,最大已超过3m,桩长可做到120m,承载力1万kN以上。其缺点主要在于群桩施工及饱和软流塑性粘性土、淤泥土等施工地层会产生挤土效应,产生挤桩、断桩或桩缩径等问题;另外,其管径范围为325-425mm,其管径受限,难以作为荷载大的高层建筑工程和承载力高的桩基。长螺旋泵注砼钻孔灌注桩的优势在于克服了缩径等不利因素,保证了成桩质量,但其主要缺陷在于如何选择适宜的钻头、终孔提钻与泵送砼的配合等施工工艺都直接影响成桩质量和其承载力,尤其是遇砂、砾及涌水量大的较复杂地层,其终孔返土不彻底易出现桩端松土现象,严重影响成桩质量,有难以克服的技术缺陷。
技术实现思路
本专利技术的目的在于采用适用于高层建筑复杂地层的桩基施工方法,以震动锤为沉管动力装置,沉管为内、外双层套装沉管,内管下端设有桩尖,解决高层建筑地基下沉的问题。为了实现上述目的,本专利技术的施工工艺步骤如下:1、将销 ...
【技术保护点】
一种高层建筑地基处理成桩施工方法,其特征在于:(1)将销接固定的内外沉管沉入桩深位,芯管桩尖探出外沉管,使桩端贯入设计要求深度;(2)、将芯管提起,向外沉管内填砼,提外沉管不脱离填入的砼,由震动锤带动芯管沿外沉管夯扩填入砼,以满足扩底筑桩的设计要求;(3)、拔出芯管,将钢筋笼沿外沉管投放、固定,实施成桩操作。
【技术特征摘要】
1.一种高层建筑地基处理成桩施工方法,其特征在于:(1)将销接固定的内外沉管沉入桩深位,芯管桩尖探出外沉管,使桩端贯入设计要求深度;(2)、将芯管提起,向外沉管内填砼,提外沉管不脱离填入的砼,由震动锤带动芯管沿外沉管夯扩填入砼,以满足扩底筑桩的设计要求;(3)...