The utility model discloses a precast concrete uplift pile, which is characterized by the pile head concrete pipe is provided with a plurality of connection and anchorage bar threaded sleeve, the anchor bars are connected by internal thread sleeve after embedded in the concrete pipe; the sleeve is vertically arranged on the pile head the end plate, and the sleeve of the port and the pile head flush end plate. The utility model has the advantages of reducing the construction process of cutting pile after construction, pile head pull-out processing instead of the broken pile effectively completed, reducing the actual pile length, reduce the difficulty of construction, shorten the cycle of construction, thus saving the material procurement cost, construction cost, especially suitable for promotion in the application of pile foundation uplift in engineering requirements.
【技术实现步骤摘要】
一种预制混凝土抗拔管桩
本技术涉及预制管桩桩基
,具体地说是一种预制混凝土抗拔管桩。
技术介绍
随着我国建筑行业的发展,地下空间建筑应用越来越广泛,大面积应用具有抗拔要求的桩基础工程也越来越多。目前,抗拔管桩一般都采用截桩的方法与基础底板连接,截桩施工在保证设计有效桩长的基础上,预留桩顶部分的管桩,在与基础底板连接时将该部分管桩的混凝土截除,保留预应力钢筋和桩头端板,再进行管桩与基础底板连接。现有技术的截桩处理存在三个不利因素:第一,增加了实际消耗的管桩用量,增加了材料采购成本;第二,在施工过程中增加沉桩工程量,沉桩后增加截桩处理工程量,增加了施工成本,延长了施工周期;第三,截桩过程中既要保证截桩面以下的桩身完整性,又要保留桩头端板及截桩部分的预应力钢筋,施工难度非常大。
技术实现思路
本技术的目的是针对现有技术的不足而提供一种预制混凝土抗拔管桩,采用桩头预埋数个套筒的管桩结构,套筒由丝扣连接的锚固钢筋预埋在管桩内,不但降低了管桩抗拔处理的施工难度,缩短了工期,而且还降低了管桩的制作和施工成本,整体结构性好,可广泛应用于抗拔管桩的桩基工程,具有材料利用率高、制作工艺简单、施工速度快和工程造价低的优点。本技术的目的是这样实现的:一种预制混凝土抗拔管桩,包括由桩头端板、预应力钢筋以及填芯内插筋预埋的混凝土管桩,其特点是混凝土管桩的桩头上设有数个与锚固钢筋丝扣连接的套筒,所述锚固钢筋由套筒的内螺纹丝扣连接后预埋在混凝土管桩内;所述套筒垂直设置在桩头端板下,且套筒的端口与桩头端板平齐。本技术与现有技术相比减少了截桩施工工序,有效代替了沉桩完成后破碎桩头作抗拔处理的施 ...
【技术保护点】
一种预制混凝土抗拔管桩,包括由桩头端板(1)、预应力钢筋(9)以及填芯内插筋(4)预埋的混凝土管桩(5),其特征在于混凝土管桩(5)的桩头上设有数个与锚固钢筋(3)丝扣连接的套筒(2),所述锚固钢筋(3)由套筒(2)的内螺纹(6)丝扣连接后预埋在混凝土管桩(5)内;所述套筒(2)垂直设置在桩头端板(1)下,且套筒(2)的端口与桩头端板(1)平齐。
【技术特征摘要】
1.一种预制混凝土抗拔管桩,包括由桩头端板(1)、预应力钢筋(9)以及填芯内插筋(4)预埋的混凝土管桩(5),其特征在于混凝土管桩(5)的桩头上设有数个与锚固钢筋(3)丝扣连接...
【专利技术属性】
技术研发人员:刘艳龙,潘君,吴向军,武成满,丁兴国,徐咏春,盛健,姚根洪,马丽,
申请(专利权)人:中船第九设计研究院工程有限公司,
类型:新型
国别省市:上海,31
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。