A kind of high strength pile legs of offshore platforms, including hull, lifting system, lifting mechanism and a fixed pile room; hull is arranged on the both sides of the deck; solid pile chamber is arranged on the deck, the lifting system is arranged at the fixed pile room; the lifting system comprises a lifting device, a fixed ring beam, leg boots, legs inserted in the fixed ring beam, a lifting device is fixed on the lower ring beam, arranged on the pile shoe legs, legs sleeved inside the fixed pile chamber, the top lifting mechanism is mounted on a fixed pile room. The invention provides a high strength through the legs of offshore platforms, the platform has a high lifting speed, fast lifting leg bearing ability, and the offshore wind power equipment transportation, piling, installation, commissioning and maintenance operations and other functions in one, with the construction of low cost and high reliability and large carrying capacity, low maintenance cost and operation conditions of strong adaptability, the design and construction process are the leading domestic level.
【技术实现步骤摘要】
本专利技术涉及海洋工程技术的
,尤其涉及一种具有高强度桩腿的海上风电平台。
技术介绍
为实现节能减排的目标,我国正在大力发展清洁能源,海上风力发电就是其中重要的能源之一。与陆地相比,海上风力发电具有环境影响小,风况优于陆地、风湍流强度小、风切变小、各种干扰限制少及海上风电场不占用土地等优点。海上风电无疑是今后风电发展的趋势。海上风电将是“十三五”风电发展的核心,未来两年内将有44个海上风电项目投产,共计1052万千瓦装机容量。可以预见,即使是保守估计,未来五年我国海上风电场建设和运维市场将达数百亿级规模。目前国内外海上风电场建设中,专用的风电安装平台或船舶较少,多采用在海上油气钻采领域使用的自升式平台或起重船来完成,同时需要生活供给船进行配合,整个过程动用船只多,定位困难,效率低;海工装备制造已基本转移到亚洲,但由于海洋工程高技术壁垒,国内企业基本没有设计能力,主要承接低端制造为主。除此之外,高端海工装备及其配套设备基本由国外垄断,其价值要远高于船体的价值,而目前看来我国在海工配套装备方面仍然涉足很少。海上风电场施工难点之一是风电机组的安装,不仅需满足吊高、吊重要求,还需保证安装时少受风浪流环境条件的影响,以保证作业时间和效率。
技术实现思路
本专利技术的目的在于针对现有技术中的不足之处,提出一种具有高强度桩腿的海上风电平台,该平台具有升降速度快、承载能力强的快速升降桩腿,且集海上风电设备运输、打桩、安装、调试和维护作业等多功能于一体,具有建造成本低、可靠性高、承载能力大、维护成本低和作业条件适应性强等优点,其设计及建造工艺均处于国内领先水平。为达到此 ...
【技术保护点】
一种具高强度桩腿的海上风电平台,包括船体、升降系统、吊装机构和固桩室;所述船体上设置有甲板;所述固桩室设于所述甲板的两侧上,所述升降系统设于所述固桩室的内部;所述升降系统包括升降装置、固定环梁、桩腿和桩靴,所述桩腿套插于所述固定环梁内,所述升降装置设于所述固定环梁上,所述桩靴设置于所述桩腿的下端,所述桩腿被套设于所述固桩室的内部,所述吊装机构安装于所述固桩室的顶端;其特征在于:所述桩腿包括平台隔板、围板和导向板,所述围板和导向板拼装组合成所述桩腿的壳体,所述平台隔板设置于所述桩腿的内部;所述升降装置包括升降滑座、升降油缸和插销机构,所述升降油缸的缸体端固定于所述固定环梁,所述升降油缸的活塞端与所述升降滑座的一端连接,所述升降滑座活动卡接在所述导向板上,并且所述升降油缸带动所述升降滑座沿所述导向板纵向运动,所述插销机构设置于所述升降滑座的中部。
【技术特征摘要】
1.一种具高强度桩腿的海上风电平台,包括船体、升降系统、吊装机构和固桩室;所述船体上设置有甲板;所述固桩室设于所述甲板的两侧上,所述升降系统设于所述固桩室的内部;所述升降系统包括升降装置、固定环梁、桩腿和桩靴,所述桩腿套插于所述固定环梁内,所述升降装置设于所述固定环梁上,所述桩靴设置于所述桩腿的下端,所述桩腿被套设于所述固桩室的内部,所述吊装机构安装于所述固桩室的顶端;其特征在于:所述桩腿包括平台隔板、围板和导向板,所述围板和导向板拼装组合成所述桩腿的壳体,所述平台隔板设置于所述桩腿的内部;所述升降装置包括升降滑座、升降油缸和插销机构,所述升降油缸的缸体端固定于所述固定环梁,所述升降油缸的活塞端与所述升降滑座的一端连接,所述升降滑座活动卡接在所述导向板上,并且所述升降油缸带动所述升降滑座沿所述导向板纵向运动,所述插销机构设置于所述升降滑座的中部。2.根据权利要求1所述的一种具有高强度桩腿的海上风电平台,其特征在于:所述平台隔板的侧边为八边形,所述平台隔板包括多个围板定位水平边沿和多个导向板定位斜切边沿,所述围板定位水平边沿和导向板定位斜切边沿间隔分布于所述平台隔板的侧边;所述围板的一侧和所述围板定位水平边沿连接,所述导向板的一侧和导向板定位斜边沿连接,所述导向板包括多个销孔,所述销孔间隔均匀地纵向设置于所述导向板上。3.根据权利要求2所述的一种具有高强度桩腿的海上风电平台,其特征在于:所述平台隔板还包括管路容纳通孔、平台板主肋和多个平台板次肋,所述管路容纳通孔设置于平台隔板的中部,所述平台板主肋设置于管路容纳通孔的边缘;多个所述平台板次肋呈散射状从管路容纳通孔向平台隔板的侧边延伸,且所述平台板次肋的一端和所述平台板主肋连接。4.根据权利要求1所述的一种具有高强度桩腿的海上风电平台,其特征在...
【专利技术属性】
技术研发人员:吴平平,刘会涛,李光远,陆军,张静波,马振军,
申请(专利权)人:广东精铟海洋工程股份有限公司,
类型:发明
国别省市:广东;44
还没有人留言评论。发表了对其他浏览者有用的留言会获得科技券。